Main Library CITES Campus Network Upgrade

University of Illinois

Urbana-Champaign, Illinois

 

To facilitate the CITES campus network upgrade for the Main Library, Henneman Engineering was retained to oversee construction of communication equipment rooms (CER) and installation of cable tray, conduit, HVAC, and raceways per CITES Program Statement.  CITES will require a 100Amp panel in each of three server rooms.  Henneman verified the routing proposed by CITES.  CER equipment, cabling, and jacks will be installed by CITES at the completion of this work.

Historically significant areas of this building are the main entrance, foyer, second floor reading room, and the north/south corridor on the main level.

Completion Date
2006

Total Construction Cost
$500,000