This project extends steam, condensate, power and signal utilities to the northwest corner of the new residence hall site boundary.  This project constructed 1,450 LF of concrete box steam conduit containing a 6” high-pressure steam and 3” condensate return line as well as electrical power and signal ductbank system from the central heating plant to the site of the new south campus engineering building and residence hall.

The ductbank contains four 5” power conduits, one 15 kV feeder circuit and six 4” signal conduits.  The project extends fiber optic cable from the campus data network hub in Gardner Hall and CATV coaxial cable from the campus TV network, including sufficient cable lengths coiled in the new terminal manhole for extension and termination into the new residence hall’s main telecommunication closet.

Completion Date
2006

Total Construction Cost
$1,900,000